Mounting X Axis Drive Assemblies

The stepper/ball screw/support assemblies were ready to be attached to the machine. I used some K clamps across the width of the machine to use as supports to lay the assemblies on while I worked on aligning them properly.

First, I determined the front-back positioning. Moving the gantry to one end of travel, and the ball nut to the same end of its travel, I aligned the center of the ball nut coupler with the center point between the X linear bearing blocks. Then I clamped the assembly in place on that end. Moving the gantry and ball nut to the other end of their travel, I aligned the ball nut coupler with the center of the linear bearing blocks and measured the extra travel available on the ball screw. I split this measurement in half to allow equal space on both ends. I readjusted the position accordingly on both ends and clamped in place again.

To get the vertical alignment correct, I mounted the wooden piece to the ball nut coupler that would attach to the gantry. I moved one end up to the gantry, readjusting the k-clamp to set the new height, re-clamped the assembly, and then moved the ball nut and gantry back to the other end and repeated.

With everything in place and aligned, I unclamped one end at a time, applied wood glue, and re-clamped.

X Axis drive assembly clamped in place

I then repeated the whole process for the second X axis drive assembly on the other side of the machine. After the glue was dry and I reconfirmed the alignment was still correct, I glued the pieces in place that attach the ball nut couplers to the gantry.

Ball nut coupler attached to gantry

Posted on

X Axis Alignment Fine Tuning

With the gantry mounted and the rails bonded in place, I was able to fine tune the X axis rail alignment.  I loosened the linear bearings on one rail and attached a dial indicator to the gantry at that same end, reading to the reference edge of the profile rail.  I ran the gantry back and forth to see how far out it was across the whole range of motion.  Most of the rail was within +/- 0.001” parallel to the opposite rail.  Toward the end there was a 6 inch section that was out by 8-10 thousandths.  I loosened those rail mounting bolts and applied some pressure on the rail by hand to bring it back to zero before re-tightening the rail.  After rechecking the whole rail it still needed some minor adjustments.  After a few rounds of this I am happy with the straightness.  Next up will be mounting the X axis drive assemblies.

Posted on

Installing and Aligning X Rails

After placing the linear guide blocks on the X rails, I placed the gantry on top of them and proceeded to align everything. I spent a lot of time aligning the X axis rails. This included making sure they were parallel with each other and also that they were perpendicular to the Y axis rails on the gantry. I clamped together a few 24” squares to get the rails parallel and then placed some 1-2-3 blocks on top of them to check that the Y axis rails were perpendicular. I clamped the rails in place as I went to keep the alignment correct. Once I was happy with everything, I marked out where the linear bearings should be mounted to the gantry. I drilled the gantry and mounted the linear bearings, then installed the gantry on the rails again. I forgot to mention that I had previously found the balance point of the gantry using a thin piece of wood running the long way under the gantry. I marked that balance point on the base of the gantry on both ends and that became the center point between the two linear bearings.

Setup for aligning X axis rails

The alignment was double and triple checked prior to bonding the rails in place with the System Three adhesive epoxy. I still have some adjustment available in the rails to make fine adjustments with a dial indicator. I had previously used a chemical etch on these pieces of bar stock, but the epoxy should be applied very soon after the etching to get a good bond. I had let too much time pass and since I am experimenting and learning here, I decided to use the “wipe down with acetone” method for this to evaluate how the bond holds up compared to the other axes where I used the etching and sanding methods.

Posted on

X Axis Build Continued

After building the first side, I just repeated the operations for the second side. I had cut all the plywood at once in the beginning to make sure the dimensions were identical, using the same saw setup. Next step was to drill and tap all the holes in the aluminum bar stock for the long X rail mounts. I followed the same process as detailed earlier to make sure the rails were straight and aligned properly.

I made plywood stepper motor mounts and bearing support mounts, all from the same birch plywood stock that I’ve been using for everything on the machine. Here you can see the left and right sides of the frame, along with the rails placed on top. The ball screw assemblies are in the center, but they will be mounted to the outer portion of the frame sides.

X axis stepper mounts

Here is a picture of the completely assembled Z axis attached to the Y axis. The only parts missing are the linear bearings that will be mounted to the bottom of the gantry.

completed gantry, y axis, and z axis

It’s looking like a CNC machine!

Posted on

X Axis Frame Build

With the Z and Y Axis components almost complete, I couldn’t wait to get the X frame components built up. I cut all the plywood pieces on the tablesaw, then figured out what angle to cut out the MDF webs. Once I made one that fit well, I used the waste piece with a stop on my cross cut sled to quickly cut out the rest of the webs:

table saw setup for cutting angled webs

I assembled these in place on the machine base and once again glued everything up and used a lot of clamps. The waste pieces from the MDF webs came in handy again to make a squared up clamping surface.

clamped x axis frame side

Posted on

More Progress on Y and Z Axis

The next bit of progress on the machine was back to working on completing the Z and Y axis components. I spent some time in Fusion 360 learning to create drawings from the components in my model. This allowed me to print out a scale drawing to use as a template for quickly and accurately placing all of the holes in the following part. An 8.5″ x 11″ sheet of paper just fit all the holes for this piece.

printed template on plywood

Z ballscrew and bearings on carriage

all Z axis components on carraige

In order to get the ball nut coupler to be flush with the Y carriage, I used a router table and a hand chisel to lower the plywood carriage slightly:

leveled carriage and ballnut coupler

The final task on this part was to make the Z stepper mount out of plywood. I glued it together and clamped it to dry overnight.

clamped stepper motor mount

Posted on

Y Axis Progress

Although I left enough space for the epoxy to form a meniscus at the edges, I decided I wanted to get the rails right up to the edges, per the original design. I used a shoulder plane while the epoxy was only partially hardened and it planed down beautifully to remove the meniscus along the outer edges. After the leveling epoxy was completely cured I bonded the aluminum rail mounts (with rails still installed) into place on the gantry, using an adhesive epoxy. I think I forgot to mention earlier during the Z Axis buildup, that all the aluminum bar stock was chemically etched prior to epoxying them to the plywood, in order to get the best bond. On one set of rails, I sanded the bonding surface with 120 grit prior to etching; another recommended method for better bonds. I’ll see how each method holds up and perhaps do some more formal testing of different bonding methods in the future.

To help align the rails, I placed identical length aluminum bar stock in between the rails at each end, where the ball screw supports will be mounted. Then I built part of the Y carriage and installed it on the rails, to hold them in alignment at the center.

Y carriage on rails

Once the epoxy cured I put a dial indicator on one set of guide bearings and measured the error all along the length of the opposite rail. I loosened one to three rail mount screws at a time and made fine adjustments to the rail until I had no more than +/- 0.0005” error throughout the full length.

dial indicator on linear bearings

Posted on

Y Axis Rails

With the epoxy leveling complete on the gantry face, it was time to prepare the Y Axis profile rails and their aluminum bar stock mounts.

When I had mounted the Z Axis rails, I clamped the rails against a straight edge and then used an automatic center punch to mark all the hole positions on the aluminum bar stock. Then I removed the rail and drilled all the holes on the drill press. That turned out to be less than ideal since the center punch was smaller in diameter than the rail mount holes and I wasn’t perfectly centered with each hole. Luckily there was enough play around the M4 screws to correct these minor errors, but I needed a better method for the Y Axis.

Again, I clamped a straight edge against the registration surface on the side of the profile rail, then aligned that with the aluminum bar stock and clamped the bar stock together with the rail. Rather than using the small diameter spring-loaded center punch to mark each hole, I found a drill bit that exactly matched the diameter of the holes in the profile rail. I inserted this bit in each hole and gave it a good tap with a hammer, leaving a mark at the center of each hole. This allowed me to drill all the holes more accurately at the drill press. I still ended up with some slight errors from my less than perfect alignment of the drill bit with the marks on the bar stock. For the second Y axis rail I tried yet another method…third time is a charm!

Leaving the rail/bar assembly clamped together, I brought the whole assembly to the drill press. I aligned the first hole on one end with the drill bit and could easily see when it was centered. I drilled the first hole, then tapped it and put a screw in. Next I drilled and tapped the hole on the opposite end and put a screw in. Followed up with one in the center, gradually removing clamps as I went. Now I could drill all the holes without having to mark anything. This method was much faster and more accurate as well. With the holes drilled and the rail still attached, the rail acted as a guide for the tap to ensure it was vertical. The tapping operation went much faster this way as well.

I didn’t take a lot of pictures of this whole process, but here are a few shots of the work and progress:

rail on drill press

Rails laid in place on the gantry for fit check:

Y axis rails in place on the gantry

Posted on

Epoxy Leveling Gantry

After planing the gantry, I realized that the front face, where I intended to mount the Y axis rails, is no longer perpendicular to the base. Since I was planning on using epoxy for the rail mounts anyway, I figured I could just use epoxy for leveling the front side of the gantry.

With the gantry on its back, I made sure the gantry bottom was perpendicular to the machine base, since that is where the X Axis bearing guides will be mounted. To minimize the use of expensive epoxy, I made a dam out of 1/2″ plywood covered with blue painters tape, which releases easily from epoxy, then sealed at the edges with clay. This dam allows the epoxy to flow only to the areas where the rail mounts and the ball screw bearing support mounts will sit for the Y-axis, with extra room allowed for the meniscus of the epoxy at all edges.

gantry with epoxy dam in place

Once the epoxy was mixed with hardener, I poured a small amount into another container and mixed in a little acetone to thin it out. I didn’t want to thin the whole batch because acetone can change the strength properties of the cured epoxy. I poured the non-thinned epoxy throughout the area and let it settle for a few minutes, and then poured the thinned epoxy over the top to achieve a very flat surface.

gantry after pouring epoxy

Remember, all of this work is driven by the fact that I didn’t start with a perfectly flat work surface. If the gantry had been properly square, I would have just attached my rail mounts and bearing supports directly to the wood face of the gantry. However, it is a good learning experience and I’m glad to have been able to test out the epoxy leveling method in case I want to use it for my next machine.

Posted on

Problem with Gantry

My first major problem with this build. After all the glue was dry on the gantry, I rotated it 90 degrees on my work surface (the machine base) to see what it would look like in its final orientation on the machine. One corner of the gantry sat above the surface by about 3/32”. I first thought it had warped after the glue-up, but back in the position where I constructed it the gantry laid perfectly flat against the base. After doing a lot of checks with a straight edge and feeler gauges I found that my base was not perfectly flat as I initially thought. It was flat along the edges in both length and width, but there was some variation throughout the center. So, between the 40 or 50 thousandths of twist introduced where I constructed the gantry, and another 30 to 40 thousandths in the final orientation, I ended up with the gantry having this 3/32” warp or twist in relation to the base.

The way I decided to fix this was to create a large planing jig for my router. Following some videos online, I mounted two long pieces of plywood (with the factory cut sides up) along the sides of my machine base and used a level and two wires running from corner to opposite corner to get the rails level and without any twist. Then I built a sled for the router that would slide along these two rails, allowing me to run the router over the whole surface with a 1 ¾” surfacing bit. I waxed the router sled and the rails, and used some clamps for stops. My wife helped out by holding the shop vac to collect the dust while I routed the entire surface of the machine base. I clamped one end of the base to my leveled workbench so that the corner with the twist would be up the air and would get milled down. If you want to see more details, this is one of the videos that provided inspiration: youtube.com/watch?v=qtkBZHLJyD0

flattening jig for work surface

flattening jig closeup

After routing the top, I flipped the base over and repeated the operation on the other side. In theory, these two sides should now be parallel and without any twist. This will hopefully get me back to square one for having a flat work surface to build the machine on.

Rather than re-constructing the whole gantry on this newly flattened surface, I decided to use the same planing jig to get the top and bottom of the gantry to be flat and parallel. This seemed to work well and now the gantry sits perfectly flat against the base.